Power & Distribution
Nothing on this list runs without clean, redundant power. We design the grid before we hang a fixture.
We design the grid first — generation, distribution, and redundancy — to a load calc and a one-line diagram per venue. Show-critical racks get A/B power and UPS, so the spine never browns out mid-cue.
Reference-grade, not a fixed rental list.
Generation
- Quiet / whisper gensets
- Paralleling
- Shore-power tie-in
Distribution
- Distro racks
- Cam-lock + socapex runs
- Isolation / grounding
- Phase balancing
Redundancy
- UPS on control + critical systems
- A/B power for show-critical racks
- Load calc per venue
3 component classes. Expand for the spec sheet.
GenerationQuiet gensets, paralleled, with shore tie-in.
Quiet/whisper gensets, paralleled for capacity and redundancy, with shore-power tie-in — sized to a load calc per venue before anything hangs.
- Whisper genset
- Paralleling
- Shore-power
| Generation | Quiet / whisper diesel gensets |
|---|---|
| Capacity | Paralleled, load-calc sized |
| Tie-in | Shore-power transfer |
| Docs | Load calc per venue |
DistributionDistro racks, cam-lock and socapex runs.
Distribution racks with cam-lock and socapex runs, isolation and grounding, and phase balancing — a documented one-line diagram for every build.
- Cam-lock / socapex
- Isolation
- One-line
| Distro | Racks, cam-lock + socapex runs |
|---|---|
| Grounding | Isolation, bonding, phase balance |
| Monitoring | Metered, fault isolation |
| Docs | One-line diagram per build |
UPS & RedundancyA/B power and UPS on everything show-critical.
UPS on control and critical systems, with A/B power to show-critical racks so the spine never browns out mid-cue.
- UPS
- A/B power
- Show-critical
| UPS | On control + critical systems |
|---|---|
| Redundancy | A/B feeds to show-critical racks |
| Coverage | Network, servers, consoles |
| Failover | Seamless transfer |
What makes it frame-accurate.
- Monitored distribution; fault isolation.
- Documented one-line diagram per build.
- Load calc verified before the first fixture hangs.